- Joined
- Sep 1, 2004
- Messages
- 6,546
- Reaction score
- 4,981
- Points
- 363
I'm going to switch the shafts in my TM SLDRs from KBS C-Taper 90 shafts to Nippon Modus NS Pro. I have everything prepped and ready to go. But here's the problem.
The new shafts are 0.335 and the old ones are 0.350. It's only a small difference but the head slightly rattles round in the hosel. The epoxy I'm sure will take care of that, but I want them to fit snugly in.
So I need shims but don't have any and it will take weeks to order them in. I was planning on making my own by cutting up a beer can into small rectangular strips. I'm planning to use three strips per shaft and epoxy them onto the shaft tip and then on into the hosel. I need to rough up the metal first with some sandpaper.
Am I mental? Any advice, please?
Thanks guys.
IG
The new shafts are 0.335 and the old ones are 0.350. It's only a small difference but the head slightly rattles round in the hosel. The epoxy I'm sure will take care of that, but I want them to fit snugly in.
So I need shims but don't have any and it will take weeks to order them in. I was planning on making my own by cutting up a beer can into small rectangular strips. I'm planning to use three strips per shaft and epoxy them onto the shaft tip and then on into the hosel. I need to rough up the metal first with some sandpaper.
Am I mental? Any advice, please?
Thanks guys.
IG